Hi all - makeing the most of the weather I moved out of the workshop and into the garden to turn my attention to 3 c5's in for repair
The wiring looks very challenging and there are a number of issues for the top bodging gallery (not by the present owner) so I will post them later but in the mean time some progress ::
As received - although working two of them were a wiring nightmare :
A very large on - off switch
So decided to strip all 3 and start again - so far the motors have been rebuilt - one replacement gearbox - all new inners - one set of tyres - 2 control box repairs - one replacement control box - all bearings greased or replaced - metal work painted - new brake blocks and cables
Next to get the bodies back on with power wiring kits and new harness as required :
Marty